Project Description
This South Kensington project required the installation of detailed, handcrafted joinery for our discerning clients. The focus was on precision and elegance, with bespoke doors and panels designed to enhance the timeless beauty of the space.
Scope of Work:
The project included:
• Fabrication and installation of custom, handcrafted doors and decorative panels.
• Ensuring every detail matched the client’s high standards and the overall aesthetic of the property.
• Collaborating with other trades and maintaining consistent communication to ensure a seamless workflow.
Challenges Faced:
• Complex Detailing: The intricate craftsmanship required meticulous attention, significantly increasing the time needed for each component.
• Time Management: With an estimated timeline of 25 weeks, maintaining steady progress while ensuring quality was paramount.
• Site Coordination: The project involved working alongside other trades, which occasionally required adjustments to our schedule.
Solutions Implemented:
• The team leveraged their extensive experience in handcrafted joinery to achieve the highest level of detail and precision.
• A carefully planned schedule ensured that all tasks were completed within the 25-week timeline originally promised to the client.
• Continuous collaboration and communication with the site manager and other trades minimized disruptions and delays.
Outcome:
The project was successfully completed within the 25 weeks as estimated. The handcrafted doors and panels added a sophisticated and timeless touch to the property, perfectly aligning with the client’s vision.
Client Feedback:
The clients were delighted with the outcome, praising the level of detail and craftsmanship that went into every aspect of the project. They appreciated the team’s professionalism, dedication, and ability to deliver on time despite the complexity of the work.
This case study highlights our expertise in delivering bespoke, high-quality joinery installations while adhering to tight timelines and maintaining exceptional standards.
Project Information
- Client: One of our customers
- Location: UK
- Year Of Complited: 2024